F09700 - SEMI F97 - Specification for Facility Package Integration, Monitoring and Control Revision:SEMI F97-0305 - Inactive SEMI C23-0301 (technical revision)
$193.00
Description
SEMI C23-0301 (technical revision)
• requirements of additional GEM capabilities
lubricants
1-1105 (technical revision)
F09700 - SEMI F97 - Specification for Facility Package Integration, Monitoring and Control Revision:SEMI F97-0305 - Inactive SEMI C23-0301 (technical revision)NOTICE: This Standard or Safety Guideline has an Inactive Status because the conditions to maintain Current Status have not been met. Inactive Standards or Safety Guidelines are available from SEMI and continue to be valid for use. The purpose of this Specification is to provide the requirements for the architecture, functionality and interfaces for facility monitoring and control systems (FMCS) and the various facility package units (FPU) to enable a
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 327.50
US$ 209.00
US$ 364.00
US$ 12.00