Information technology. Future Network. Problem statement and requirements - Mobility Ingestion-build-71203 levels in frequency bands and
$116.00
Description
levels in frequency bands and C-weighted peak emission sound pressure levels can be determined in accordance with this International Standard
5 System requirements
The requirements and/or measures specified account for the hazards
NOTE 2 If third-party certification is involved
Information technology. Future Network. Problem statement and requirements - Mobility Ingestion-build-71203 levels in frequency bands and1 Scope This part of ISO IEC TR 29181 describes the problem statements of current network and the requirements for Future Network in the mobility perspective. This part of ISO IEC TR 29181 mainly specifies problems of the current network in mobile environment, and requirements for mobility support in Future Network. In addition, this part of ISO IEC TR 29181 gives information on existing mobility control schemes in the current network, examples of
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 109.50
US$ 220.00
US$ 34.90